The contractor is anticipating to make the connection at the
existing water main that crosses under Glenview Road early next week. To make
the connection, the water main in the area will need to be turned off. Residents
affected by the shut-down will be notified prior to water service being
disrupted.
Also last week, the contractor installed storm sewer
services to the residents along Central Road. If the resident had an existing
storm sewer service or drain, it was reconnected to the new service in the same
location. If no existing storm service was present, the contractor installed a
stub at each property for future connection by the homeowner. Should a
homeowner wish to install a storm sewer service on their private property
and/or connect to the storm sewer, please contact the Village of Glenview to
determine the actions needed and permits required prior to installing the
system.
Next week, the contractor will connect to the existing water
main along Glenview Road and begin the necessary testing prior to connecting
homes to the new water main.
The contractor will also begin installing new sanitary sewer
services and manholes along Glendale Drive. A new 6-inch PVC sanitary
sewer service will be installed to each residence along Glendale Drive. The new
sanitary sewer service will be connected directly to the existing sanitary
sewer service and placed in the same location. There will be no disruption to
your sanitary sewer during this process. If possible, we do ask that you limit
your water usage during the new sanitary sewer service installation.
Central Road roadway reconstruction including removing the existing soils under the roadway, installing new aggregate base, concrete curb & gutter, and asphalt pavement will also begin next week. The entire roadway reconstruction process will likely take 2 to 3 weeks to complete. Residents will be notified of any restrictions to their driveways prior to the work beginning.
Have a safe and enjoyable Labor Day Weekend!!!