Water Main On-Going. Central Road Roadway Reconstruction to Begin
This past week, DiMeo Brothers continued with the water main
installation along Westview Road from the westerly end to Glenayre Drive and
toward Glenview Road.
Central Road roadway reconstruction including removing the existing soils under the roadway, installing new aggregate base, concrete curb & gutter, and asphalt pavement will also begin next week. The entire roadway reconstruction process will likely take 2 to 3 weeks to complete. Residents will be notified of any restrictions to their driveways prior to the work beginning.
The contractor is anticipating to make the connection at the
existing water main that crosses under Glenview Road early next week. To make
the connection, the water main in the area will need to be turned off. Residents
affected by the shut-down will be notified prior to water service being
disrupted.
Also last week, the contractor installed storm sewer
services to the residents along Central Road. If the resident had an existing
storm sewer service or drain, it was reconnected to the new service in the same
location. If no existing storm service was present, the contractor installed a
stub at each property for future connection by the homeowner. Should a
homeowner wish to install a storm sewer service on their private property
and/or connect to the storm sewer, please contact the Village of Glenview to
determine the actions needed and permits required prior to installing the
system.
Next week, the contractor will connect to the existing water
main along Glenview Road and begin the necessary testing prior to connecting
homes to the new water main.
The contractor will also begin installing new sanitary sewer
services and manholes along Glendale Drive. A new 6-inch PVC sanitary
sewer service will be installed to each residence along Glendale Drive. The new
sanitary sewer service will be connected directly to the existing sanitary
sewer service and placed in the same location. There will be no disruption to
your sanitary sewer during this process. If possible, we do ask that you limit
your water usage during the new sanitary sewer service installation.
Central Road roadway reconstruction including removing the existing soils under the roadway, installing new aggregate base, concrete curb & gutter, and asphalt pavement will also begin next week. The entire roadway reconstruction process will likely take 2 to 3 weeks to complete. Residents will be notified of any restrictions to their driveways prior to the work beginning.
Have a safe and enjoyable Labor Day Weekend!!!
Friday, August 22, 2014
Water Main Installation On-Going
This past week, DiMeo Brothers continued with the water main
installation along Glendale Drive between Central Road and Westview Road.
Roadway reconstruction including removing the existing soils under the roadway, installing new aggregate base, concrete curb & gutter, and asphalt pavement will begin following the Labor Day weekend. The entire roadways reconstruction process will likely take 2 to 3 weeks along Central Road. Residents will be notified of any restrictions to their driveways prior to the work beginning.
Next week, the contractor will continue to install the new
water main along Westview Road. The contractor is anticipating to start along
Westview Road working west towards the cul-de-sac. Once that section is
completed, the contractor will work east of Glendale Drive towards Glenayre
Drive and Glenview Road.
The contractor is also anticipating to complete the storm
sewer services along Central Road next week.
Roadway reconstruction including removing the existing soils under the roadway, installing new aggregate base, concrete curb & gutter, and asphalt pavement will begin following the Labor Day weekend. The entire roadways reconstruction process will likely take 2 to 3 weeks along Central Road. Residents will be notified of any restrictions to their driveways prior to the work beginning.
Tuesday, August 19, 2014
August 18, 2014
The general contractor DiMeo Brothers, Inc. started the water main installation on Glendale Drive late last week and is anticipating continuing the water main installation on Westview before the end of this week. In preparation for this underground work on Westview Road, on Tuesday 8-19-14 the road will be ground up into a crushed asphalt base which will allow for vehicle access to all driveways, reduce pavement saw-cutting and provide the maximum flexibility for water main underground construction.
The general contractor DiMeo Brothers, Inc. started the water main installation on Glendale Drive late last week and is anticipating continuing the water main installation on Westview before the end of this week. In preparation for this underground work on Westview Road, on Tuesday 8-19-14 the road will be ground up into a crushed asphalt base which will allow for vehicle access to all driveways, reduce pavement saw-cutting and provide the maximum flexibility for water main underground construction.
Friday, August 15, 2014
Water Main Installation along Glendale Drive Started
This past week, DiMeo Brothers completed the new storm sewer
along Central Road between Glendale Drive and Glenridge Drive. The contractor
also started the new water main installing along Glendale Drive starting at
Central Road and moving north towards Westview Road. During the water
main installation, there will be some scheduled water main shut downs.
Residents will be notified prior to any scheduled disruption in water service.
As always with underground utility construction, the
potential of water main breaks is always present. Should this occur, the water
main will need to turned off to repair the damage. Every effort will be made to
notify those effected residents as soon as possible.
Next week, the contractor will continue to install water
main along Glendale Drive from Central Road up to Westview Road. The contractor
will also install the storm sewer services to those homes adjacent to the
Central Road storm sewer.
Once the storm sewer services and remaining underground
utility work is completed along Central Road, the contractor will begin roadway
reconstruction in this area. The roadway reconstruction will include removing
the existing asphalt pavement and soils below the pavement, installing an
aggregate base course, concrete curb & gutter, and asphalt pavement. The
process will take a few weeks to complete, but could begin near the end of next
week. Residents will be notified of any access restrictions to their driveways
during the roadway reconstruction process.
Thank you again for your understanding and patience as you
deal with living within a construction area. The Village is committed to doing
everything possible to minimize the inconveniences associated with
construction.
Friday, August 8, 2014
Storm Sewer Work nearing Completion along Central Road
This past week, DiMeo Brothers continued to install the new
storm sewer along Central Road between Glenayre Drive and Glenridge Drive. The
contractor continued to install the mainline storm sewer and the cross-street
inlets and catch basins that will eventually be within the new concrete curb
& gutter.
Next week, the contractor will continue to install storm
sewer along Central Road between Glendale Drive and Glenridge Drive. The
contractor will primarily focus on the cross street catch basins and inlets on
the north side of Central Road and the piping that connects them to the
mainline storm sewer on the south side of the roadway. Due to the contractor
excavating across the roadway, getting through Central Road will be
increasingly more difficult as the construction progresses. The roadway will be
opened to traffic at the end of each working day.
Depending
on work progress, the contractor may begin installing the new water main along
Glendale Drive next week as well.
The Village is requesting that if you have not contacted
Russ Jensen, project manager, regarding your desired location for the storm
sewer service connection within your property, please do so at your earliest
convenience. Russ can be contacted at 847-904-4418 or rjensen@glenview.il.us.
Friday, August 1, 2014
Storm Sewer Installation along Central Road is On-Going.
This past week, DiMeo Brothers continued to install the new
storm sewer along Central Road between Glendale Drive and Glenayre Drive.
Nicor has continued to install new gas main and services in the neighborhood. They anticipate the work to be completed in the next 2-3 weeks.
Next week, the contractor will continue to install storm
sewer along Central Road from Glenayre Drive east to Glenridge Drive. The
contractor will likely continue working on the Central Road storm sewer for the
next few weeks.
Nicor has continued to install new gas main and services in the neighborhood. They anticipate the work to be completed in the next 2-3 weeks.
We thank you and appreciate your patience during the
on-going construction. We understand the inconveniences the construction
causes to your daily lives and the Village is committed to minimizing these
inconveniences as much as possible.